How Long Did Your Embroidery Take?
This kurta took 70 hours of hand-stitching.
A machine can stitch the same design in 1.4 h. Pick a garment and how heavily it's embroidered, and watch the two race.
What should those hours pay?
Labour alone for this one piece, before fabric, thread, design, washing or shipping. Set the wage you think is fair.
That's as long as…
How we estimate this, and adjust the assumptions
These are estimates. Hours = stitch count ÷ hand speed, plus a fixed allowance for tracing the design, framing the fabric and finishing. Machine time = stitch count ÷ machine speed, with no setup time counted, which flatters the machine slightly.
Stitch counts depend on motif size, stitch type and thread thickness, so treat every number here as a typical range for each choice, not a measurement of one specific garment.
Where the defaults come from. Stitch counts are anchored on published estimates that a mid-level hand-embroidered kurta holds 50,000–100,000 stitches and heavy pieces 300,000 or more; other garments are scaled by area. Hand speed of 15 stitches a minute sits inside the range implied by reports of a 3,000-stitch motif taking 2–3 hours and a kurta taking 100+ hours of handwork. Machine speed of 700 stitches a minute reflects the 600–750 most commercial machines actually run at, below their advertised maximum.
Sources: Saroj Jain · Chikankaar · Craft Tribe · The Citizen · ZDigitizing


Share and get 15% off!
Simply share this product on one of the following social networks and you will unlock 15% off!